01Greenwich, London
Mansard roof drawings for Greenwich houses
Greenwich's mansard test, in the council's words, is “established character required”. Where a street has no mansard tradition, the council refuses one, so the first drawing we make is of your roofline and the roofs either side, from £845 including VAT.
From £845 (VAT included)
- MCIAT chartered architectural technologists
- £2m professional indemnity insurance
- LABC Partnered
- ICO registered
02The brief
The established-character test
The council refuses mansard extensions where the area has no mansard character already, and its shorthand is “established character required”. Where one is acceptable it is typically a flat-topped or double-pitched roof behind a front parapet. The exact slope limits sit in the table.
A terrace of unbroken pitched roofs is therefore a harder case than a street where roofs have been altered over time. The survey records which of the two yours is.


03The record
Local figures for Greenwich
| Measure | Value | Period | Source |
|---|---|---|---|
| Mansards (flat-topped or double-pitched) acceptable only where established in typology/streetscape, typically behind a front parapet | <70 deg lower / <30 deg upper slope degrees | No period | royalgreenwich.gov.uk, Royal Greenwich Urban Design Guide SPD (adopted October 2023), Chapter I, para i.72, p.278 |
| Mansard extensions refused where not already an established character in the area | established character required | No period | royalgreenwich.gov.uk, Royal Greenwich Urban Design Guide SPD (adopted October 2023), Chapter I, para i.73, p.278 |
| Mansards set back from front and rear facades; raised party-wall chimney stacks reinstated at higher level | set back from front and rear facades | No period | royalgreenwich.gov.uk, Royal Greenwich Urban Design Guide SPD (adopted October 2023), Chapter I, para i.74, p.278 |
| Dormer guideline: below ridge, in from each party wall, above eaves | 0.5 m from ridge, party walls and eaves m | No period | royalgreenwich.gov.uk, Royal Greenwich Urban Design Guide SPD (adopted October 2023), Chapter I, para i.66 and Fig i.30, pp.274-275 |
| Loft conversions accepted only if headroom achieved without raising ridge; ridge must stay continuous along terrace | no ridge raise | No period | royalgreenwich.gov.uk, Royal Greenwich Urban Design Guide SPD (adopted October 2023), Principle I.3.1, pp.274 and 278 |
| Full-width box dormers discouraged; hip-to-gable conversions not supported | no full-width box dormer; no hip-to-gable | No period | royalgreenwich.gov.uk, Royal Greenwich Urban Design Guide SPD (adopted October 2023), para i.68, Figs i.34 and i.36, pp.274 and 277 |
| Class B, condition B.2(b)(i)(aa) | Class B requires the original eaves to be maintained or reinstated, which a parapet-fronted mansard normally removes | No period | legislation.gov.uk |
| Class AA, para AA.1(b) | Class AA is not available on article 2(3) land | No period | legislation.gov.uk |
| Householder: alterations/extensions to a single dwellinghouse, from 1 Apr 2026 | 548 GBP | No period | ribblevalley.gov.uk |
| Conservation areas | 23 named conservation areas published by the council | No period | planning.data.gov.uk |
| Listed building entries | 540 list entries (Historic England, within the LPA boundary) | No period | planning.data.gov.uk |
| Householder applications granted | 77.1 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
04The drawing
A mansard roof in section
A London terrace with a mansard behind the parapet. The lettered marks show the limits the legend gives.
- A Greenwich: lower slope
- <70 deg lower / <30 deg upper slope degrees
- B Greenwich: set-back and parapet
- set back from front and rear facades
- C Permitted development and the eaves
- Class B requires the original eaves to be maintained or reinstated, which a parapet-fronted mansard normally removes
- D Additional storeys under permitted development
- Class AA additional storeys exclude houses built before 1 Jul 1948 or after 28 Oct 2018
- E Fire protection to the stair
- New storey above 4.5 m by loft conversion: protect the full escape route with fire-resisting doors (min E 20) and partitions (min REI 30)
05The detail
How a mansard has to sit
The guidance asks for a mansard to be set back from front and rear facades, and for raised party-wall chimney stacks to be reinstated at the higher level. On a loft conversion without a mansard the shorthand is “no ridge raise”: headroom must come without raising the ridge, which has to stay continuous along the terrace.
Dormers are held to their own guideline, shown in the table, and the council's position on bulk is “no full-width box dormer; no hip-to-gable”. Those limits shape the design before any detail does.
Conservation areas and listed roofs
Greenwich has 23 conservation areas and 540 list entries, and Class AA is not available on article 2(3) land. A listed roof needs consent too, covered in listed building consent drawings in Greenwich.
Class B requires the original eaves to be maintained or reinstated, which a parapet-fronted mansard normally removes. That is why a mansard normally goes through a full householder application.
The drawing set and the fee
The set records the terrace as built and as altered, so the officer can follow the ridge, the parapet and the chimney stacks across the party walls. The Party Wall etc. Act 1996 sets the notice: Party structure notice at least 2 months before work.
Greenwich decided 624 householder applications in its published figures and granted 77.1%. The council fee is £548, separate from ours. A lower floor is a different application: basement conversion drawings in Greenwich.

06The papers
What the drawings rest on
Lawful development certificates
07Correspondence
Questions
Will Greenwich allow a mansard on my street?
Only if mansards already form part of the area's character, because the council refuses them elsewhere. We survey the roofs along your street and tell you in the free constraints check whether a mansard exists there already, before you pay for drawings.
Can I raise the ridge to get headroom in Greenwich?
The council's shorthand is “no ridge raise”. Headroom has to be found without a higher ridge, and the ridge must stay continuous along the terrace.
Are hip-to-gable and full-width box dormers possible?
The guidance says “no full-width box dormer; no hip-to-gable”, so neither is a sound first choice. We draw the option the council can support.

77.1%
Householder applications granted, Greenwich, 1 July 2025 - 30 June 2026. Source: assets.publishing.service.gov.uk
08Further reading
Related pages
Other services in Greenwich
09Sources
Sources and dates
- royalgreenwich.gov.uk, retrieved
- legislation.gov.uk, retrieved
- ribblevalley.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- legislation.gov.uk, retrieved
- gov.uk, retrieved
Licences
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Send us the address of your house.
We look up the conservation area, listing and Article 4 position, then reply with a fixed fee. A message before 3pm is answered the same working day.