01Building regulations

Regularisation drawings for work built without building control

An extension, loft or conversion was built and nobody told building control. A buyer's solicitor has now asked for the certificate. The law lets the owner apply to put it right. We survey what stands, draw it as built and prepare the application. From £1,035, fixed before we start.

From £1,035 inc survey (£835 if you supply measured drawings)

  • MCIAT chartered architectural technologists
  • £2m professional indemnity insurance
  • LABC Partnered
  • ICO registered

Fixed fee, no VAT to add

Ask for a fixed fee

Photographs or current plans (optional)

Drag files here or browse your device

Up to 10 files, 90 MB in total: PDF, JPG, PNG or DWG

    Write to us before 3pm and we reply the same working day. Redraws are free until approval.

    02The fee

    One fixed fee, published

    Regularisation drawings

    from £1,035

    inc survey (£835 if you supply measured drawings). No VAT to add.

    Ask for your fixed fee

    What you get

    • Our measured survey of the building as it stands, part of the fee shown
    • As-built plans, sections and details, drawn to what building control needs to assess
    • A schedule of what may need opening up, so you know the cost before you agree
    • The regularisation application to the council or your approved inspector, prepared
    • Replies to building control, and a free redraw if they ask for a change

    The council's regularisation fee is separate and is paid to the council. Our fee carries no VAT to add.

    03How it runs

    Putting built work on the building control record

    Putting built work on the building control recordSurvey the work as it stands; Draw it as built, with the construction shown; Apply for a regularisation certificate; Inspections; some work laid open; Certificate issued, or a list of fixesi

    Survey the work as it stands

    ii

    Draw it as built, with the construction shown

    iii

    Apply for a regularisation certificate

    iv

    Inspections; some work laid open

    v

    Certificate issued, or a list of fixes

    The inspector can ask for work to be exposed, so an early look at what is hidden saves surprises.
    House extension under construction with scaffolding, new glazed doors and building materials

    11 Nov 1985

    Work carried out on or after this date without building regulations approval may be regularised. Source: legislation.gov.uk

    Photograph: Brett Jordan

    04Building regulations

    What the law allows

    Where unauthorised building work was carried out on or after 11 November 1985, the owner may apply in writing to the authority for a regularisation certificate. The application must say that it is made under that regulation, describe the work and include plans where that is reasonably practicable.

    The authority can then require reasonable steps to find out what is needed, including laying the work open for inspection, making tests and taking samples. That means a wall may be opened, a floor lifted or a roof inspected. We plan for it in advance and tell you where the likely openings are.

    A slate roof pitch with a rooflight set into it, seen from the roof of a house being renovated
    A converted roof: insulation, fire protection and structure are hidden here, and the inspector may want to see them.Photograph: Gareth1953 All Right Now, CC BY 2.0

    05Building regulations

    Planning and building control are separate

    A regularisation certificate speaks only to building regulations. It does not cure a missing planning permission, which has its own ten-year enforcement clock, and it is not a substitute for a Lawful Development Certificate where the work needed one.

    If the work needed planning permission and did not get it, a retrospective application is the planning side of the same fix. We can draw both from one survey, so the as-built plans agree.

    What putting it right costsSurvey and as-built drawings: £1,035; Council regularisation fee: set by the council; Opening-up and any remedial work: your builder; Changes building control asks for on paper: free£Survey and as-built drawings£1,035£Council regularisation feeset by the council£Opening-up and any remedial workyour builder£Changes building control asks for on paperfree
    We do not guess council or builders' figures.

    06Building regulations

    What it means for a sale

    A buyer's solicitor will ask for the completion or regularisation certificate for any extension, loft or conversion, and a missing one can delay or reprice a sale. Contravening the building regulations is also an offence on conviction, which is why councils prefer a house to come forward than to hide.

    Everyone who designs or carries out building work is expected to be competent, and a drawing set that matches the building is the plainest proof that someone looked. Where the original design was poor, we will say what to change, with a view on cost, in our building regulations drawings.

    A flat-fronted Victorian house of 1898 in brick and stone with arched sash windows and a bay
    A Victorian house with later alterations: the as-built survey records what was really done.Photograph: sludgegulper, CC BY-SA 2.0

    07The record

    Figures that shape the job

    1. 11 Nov 1985

      Work carried out on or after this date without building regulations approval may be regularised.

      Source: Building Regulations 2010, regulation 18, checked 25 Oct 2026

    2. Owner

      The owner may apply in writing, with a description of the work and plans where reasonably practicable.

      Source: Building Regulations 2010, regulation 18(2), checked 25 Oct 2026

    3. Laid open

      The authority may require the work to be opened up, tested and sampled before it decides.

      Source: Building Regulations 2010, regulation 18(3), checked 25 Oct 2026

    4. 2 years

      Greatest prison term, or a fine, on indictment for contravening the building regulations.

      Source: Building Act 1984, section 35, as amended by the Building Safety Act 2022, checked 17 Oct 2026

    5. 10 years

      How long planning enforcement can run against most unauthorised building work, since 25 April 2024.

      Source: Town and Country Planning Act 1990, section 171B, checked 17 Oct 2026

    6. Competence

      Designers and builders must have the skills, knowledge and experience for the work they do.

      Source: Building Regulations 2010, regulation 11F, checked 15 Oct 2026

    08Questions

    What clients ask before they instruct us

    What if the work was done before 1985?

    The regularisation route covers work done on or after 11 November 1985. Older work is generally outside it, and we explain what a solicitor will usually accept instead.

    Will the inspector make me take the work out?

    Only if it cannot be made to comply. Often the answer is a list of modest fixes, such as a fire door, extra insulation or a lintel check, and we price them before you agree.

    What does the fixed fee cover?

    The survey, the as-built drawings, the application and replies to building control, from £1,035 with no VAT to add. The council's fee and any building work are separate.

    Can I regularise work I did not build?

    Yes. The owner applies, whoever built it. A previous owner's loft is now your problem, and the application is how it becomes your record.

    Does it fix a missing planning permission?

    No. That is a different process; see retrospective planning applications. We can run both together from one survey.

    Kensington street lined with brick townhouses and lit streetlamps beneath an orange dusk sky

    Send us the address of your house.

    We look up the conservation area, listing and Article 4 position, then reply with a fixed fee. A message before 3pm is answered the same working day.

    Regularisation Drawings London | From £1,035