How much does a tender package cost in London?

A tender package for a London house project costs from £1,095 with us, as a fixed fee with no VAT to add. It puts the drawings, specification and a priced schedule in one set that each builder prices, so the quotes you receive can be compared on the same basis.

From £1,095

  • MCIAT chartered architectural technologists
  • £2m professional indemnity insurance
  • LABC Partnered
  • ICO registered

Fixed fee, no VAT to add

Ask for a fixed fee

Photographs or current plans (optional)

Drag files here or browse your device

Up to 10 files, 90 MB in total: PDF, JPG, PNG or DWG

    Write to us before 3pm and we reply the same working day. Redraws are free until approval.

    What the price covers

    Quotes for the same project often differ because each builder has priced a different job. A tender package removes that. For £1,095 we assemble a coordinated set of architectural, structural and building regulations drawings, a specification written clause by clause, and a schedule of works that each builder prices in the same order. They all price the same thing.

    You then compare totals and line items, ask each builder about the differences, and choose with the facts. It is the document a careful client would want before signing a building contract.

    What goes in the packageThe drawings the builder will build from; A written specification of materials; A pricing schedule to fill in; Nothing left for builders to guess; A tender letter setting the rules and datesiThe drawings the builder will build fromiiA written specification of materialsiiiA pricing schedule to fill inivNothing left for builders to guessvA tender letter setting the rules and dates
    Build costs are the builders' quotes; the package is ours.

    When it pays for itself

    A tender is worth having when the budget is large or the building old, because the hidden costs live in the gaps between drawings and quotes: who supplies the steel, who allows for the party wall, who pays to make good. A schedule makes each gap a line that must be filled.

    It also helps you after the quote. A fixed specification is the benchmark for variations. If a builder wants to change a material, the schedule shows what was agreed.

    Front of a stucco house on Chester Square in Belgravia, with a pillared porch, black door, iron balconies and climbing plants
    Chester Square: on a project like this the details of stone, joinery and ironwork are where quotes differ most.Photograph: Pierrette13, CC BY-SA 4.0

    Who carries the client's duties

    On a domestic job, the law sets duties on the client that most owners never knew they had. With a single contractor, a domestic client's duties pass to that contractor; a designer can take them on by written agreement as principal designer, and without that agreement they pass automatically to the principal contractor.

    That is worth knowing before you sign. Ask your designer and builder who holds which duty before the build starts, and get the answer in writing.

    Notices a builder must give

    Building control must be told of the intention to start, and work may start two days after the notice; it must hear within five days that work has begun. Your builder gives these notices; the package reminds them of both.

    Builders must also be competent for the work they take on: regulation 11F puts that duty on anyone who designs or carries out building work. Ask each tenderer how they meet it. Our tender package page shows the layout.

    New timber roof rafters set out over a masonry wall during a house renovation
    New rafters over masonry: items like this in the schedule are what the builders price and what you later check.Photograph: Bryn Pinzgauer, CC BY 2.0

    Ordering

    If we drew the project, the package follows from the drawings. If another designer did, send the set. Either way we confirm the fee in writing first.

    From drawings to comparable quotesSend the drawings or use ours; Fixed fee in writing; Specification and schedule written; Sent to the builders you choose; You compare the returnsi

    Send the drawings or use ours

    ii

    Fixed fee in writing

    iii

    Specification and schedule written

    iv

    Sent to the builders you choose

    v

    You compare the returns

    You choose the builder; we do not.

    The figures, with sources

    1. Single contractor

      On a one-contractor job a domestic client's duties pass to the contractor.

      Source: HSE, Domestic clients and CDM 2015, checked 25 Oct 2026

    2. Principal designer

      A designer can take on the client's duties by written agreement.

      Source: HSE, Domestic clients and CDM 2015, checked 25 Oct 2026

    3. Default

      Without a written agreement, the duties pass automatically to the principal contractor.

      Source: HSE, Domestic clients and CDM 2015, checked 25 Oct 2026

    4. 2 days

      Wait after notice of intention to start before building work may begin.

      Source: Building Regulations 2010, regulation 16, checked 15 Oct 2026

    5. 5 days

      Longest wait after work starts before telling building control it has commenced.

      Source: Building Regulations 2010, regulation 16, checked 15 Oct 2026

    6. Reg. 11F

      Anyone designing or carrying out building work must have the skills, knowledge and experience for it.

      Source: Building Regulations 2010, regulation 11F, checked 15 Oct 2026

    Questions

    Do you find the builders for me?

    No. You choose who to invite; we prepare the package and, if you wish, compare the returns.

    Is the build cost included?

    No. Build costs are the builders' quotes. The package is the document that lets you compare them.

    Can I use it with drawings you did not make?

    Yes, after we have read them and agreed the fee.

    Do I need one on a small job?

    On a modest project a single quote may be enough. We tell you honestly if a package would not pay for itself.

    The fee for tender package

    Tender package

    from £1,095

    The total you pay. No VAT to add.

    Get a fixed quote from £1,095

    What you get

    • A coordinated set of drawings to build from
    • A written specification of materials and finishes
    • A pricing schedule for each builder to complete
    • A tender letter with dates, queries and exclusions
    • A comparison of the returned tenders
    House extension under construction with scaffolding, new glazed doors and building materials

    Single contractor

    On a one-contractor job a domestic client's duties pass to the contractor. Source: hse.gov.uk

    Photograph: Brett Jordan
    Kensington street lined with brick townhouses and lit streetlamps beneath an orange dusk sky

    Send us the address of your house.

    We look up the conservation area, listing and Article 4 position, then reply with a fixed fee. A message before 3pm is answered the same working day.

    Tender Package Cost in London: From £1,095