Suburban semi-detached house wrapped in scaffolding and white sheeting for a loft conversion, a red cherry-picker lorry in the road
Photograph: David Hawgood (CC BY-SA 2.0)

01Building regulations

How much do fire strategy plans cost in London?

Fire strategy plans for a London house cost from £485 with us, as a fixed fee with no VAT to add. They draw the escape route, the alarm system and the fire-resisting construction that building control checks, most often for a loft conversion or a large extension.

From £485

  • MCIAT chartered architectural technologists
  • £2m professional indemnity insurance
  • LABC Partnered
  • ICO registered

Fixed fee, no VAT to add

Ask for a fixed fee

Photographs or current plans (optional)

Drag files here or browse your device

Up to 10 files, 90 MB in total: PDF, JPG, PNG or DWG

    Write to us before 3pm and we reply the same working day. Redraws are free until approval.

    What the plans cost and show

    Our fire strategy plans start at £485. They are a set of marked-up plans, with notes, that show how a person leaves the building from every habitable room: the route to the front door, the doors that must resist fire, the alarm positions and any escape windows. Building control reads them alongside the technical drawings.

    They are most useful when the layout changes the way people move through the house. A new loft room on the top of a three-storey terrace is the commonest case.

    What the plans markThe escape route from every habitable room; Fire-resisting doors and partitions; Smoke alarm positions and grade; Escape windows where they are needed; Notes tied to Approved Document BiThe escape route from every habitable roomiiFire-resisting doors and partitionsiiiSmoke alarm positions and gradeivEscape windows where they are neededvNotes tied to Approved Document B
    Drawn on your technical set so building control sees one drawing.

    The minimum every home must meet

    Approved Document B sets a floor for every dwelling: a fire detection and alarm system of at least Grade D2, Category LD3, with mains-powered alarms. The guidance in force is the 2019 edition, collated with later amendments.

    On top of that, the layout decides. A bedroom on a new storey must have a way out, and the more storeys the house has, the more the plan has to show.

    A flat-fronted Victorian house of 1898 in brick and stone with arched sash windows and a bay
    A tall Victorian front: on a house with three floors the stair is the escape route, and every door onto it counts.Photograph: sludgegulper, CC BY-SA 2.0

    Loft conversions and the 4.5 metre line

    This is where the plans earn their keep. Where a loft conversion creates a storey more than 4.5 metres above ground, the full escape route must be protected with fire-resisting construction: doors rated at least E 20 and partitions at least REI 30.

    That affects the design as much as the drawings. Doors must be hung, the stair enclosed and the hall opened up or closed in. It is far cheaper to find this out on paper. Our loft conversion service draws this into every set.

    Why a clear plan matters to the decision

    Building control has five weeks to decide a full plans application, unless a longer period is agreed. A fire strategy plan that shows each requirement answers the first questions an inspector asks and shortens the exchange.

    Contravening the regulations carries real consequences, up to two years in prison, or a fine, on indictment. Few homeowners ever see that, but the plans exist so the build is safe and the certificate can be issued at the end.

    New timber roof rafters set out over a masonry wall during a house renovation
    A roof structure under construction: a conversion of this kind is where the escape route most often has to be redesigned.Photograph: Bryn Pinzgauer, CC BY 2.0

    How to order

    Send the plans, or let us survey. Learn more on our fire strategy plans page.

    From layout to fire planSend the layout or have us survey; Fixed fee in writing; Escape routes worked out; Plans marked up and checked; Sent with the technical seti

    Send the layout or have us survey

    ii

    Fixed fee in writing

    iii

    Escape routes worked out

    iv

    Plans marked up and checked

    v

    Sent with the technical set

    We flag layout changes before you spend on a builder.

    The figures, with sources

    1. Grade D2

      Minimum alarm system for any dwelling: category LD3 to BS 5839-6, with mains-powered alarms.

      Source: Approved Document B Volume 1, checked 15 Oct 2026

    2. 4.5 m

      Height above which a new loft storey needs its whole escape route protected.

      Source: Approved Document B Volume 1, paragraph 2.21, checked 15 Oct 2026

    3. E 20 / REI 30

      Minimum ratings for fire-resisting doors and partitions along that route.

      Source: Approved Document B Volume 1, paragraph 2.21, checked 15 Oct 2026

    4. 2019 ed.

      Edition of Approved Document B Volume 1 now in force, collated with later amendments.

      Source: GOV.UK, Fire safety: Approved Document B, checked 25 Oct 2026

    5. 5 weeks

      Time to decide a full plans application unless a longer period is agreed in writing.

      Source: Building Regulations 2010, regulation 14A, checked 15 Oct 2026

    6. 2 years

      Most a court can impose in prison, on indictment, for breaking the building regulations.

      Source: Building Act 1984, section 35, checked 17 Oct 2026

    Questions

    Do I need a fire strategy plan for every extension?

    Not as a separate drawing. Most house extensions are covered in the technical set; it is loft conversions and layout changes that benefit from a dedicated plan.

    How is it different from the building regulations drawings?

    The technical set shows how the building is made. The fire strategy plan pulls the escape and fire protection onto sheets the inspector can read at a glance.

    Do you test doors and materials?

    No. We specify the ratings required; the manufacturer's certificate shows the product meets them.

    What if building control wants more?

    We amend the plans at no charge until approval.

    The fee for fire strategy plans

    Fire strategy plans

    from £485

    The total you pay. No VAT to add.

    Get a fixed quote from £485

    What you get

    • The escape route marked from every habitable room
    • Fire-resisting doors and partitions identified
    • Alarm positions and grade noted
    • Escape windows located where required
    • Notes for your builder and building control
    House extension under construction with scaffolding, new glazed doors and building materials

    Grade D2

    Minimum alarm system for any dwelling: category LD3 to BS 5839-6, with mains-powered alarms. Source: gov.uk

    Photograph: Brett Jordan
    Kensington street lined with brick townhouses and lit streetlamps beneath an orange dusk sky

    Send us the address of your house.

    We look up the conservation area, listing and Article 4 position, then reply with a fixed fee. A message before 3pm is answered the same working day.

    Fire Strategy Plans Cost in London: From £485