Two-storey extension shell in white blockwork with open window holes beside a semi-detached house, a cement mixer and telehandler in front
Photograph: David Hawgood (CC BY-SA 2.0)

01Building regulations

How much do regularisation drawings cost in London?

Regularisation drawings for a London house cost from £1,035 inc survey with us, or £200 less if you supply measured drawings, as a fixed fee with no VAT to add. They record work built without building regulations approval; the council's regularisation charge is separate.

From £1,035 inc survey (£835 if you supply measured drawings)

  • MCIAT chartered architectural technologists
  • £2m professional indemnity insurance
  • LABC Partnered
  • ICO registered

Fixed fee, no VAT to add

Ask for a fixed fee

Photographs or current plans (optional)

Drag files here or browse your device

Up to 10 files, 90 MB in total: PDF, JPG, PNG or DWG

    Write to us before 3pm and we reply the same working day. Redraws are free until approval.

    What the price covers

    Regularisation is what you do when building work was done without building regulations approval: a loft conversion that was never signed off, a kitchen extension built years ago, a removed wall. From £1,035 inc survey, we survey what exists, draw it in the way an inspector can assess, and prepare the application you send to the council.

    The drawings differ from a new scheme in one way: they record what is there, including what is hidden. We show the structure, the insulation and the fire protection as far as we can establish them, and we say where we cannot.

    Regularising existing workSurvey and regularisation drawings: £1,035 inc survey; Council regularisation charge: set by the council; Opening up and testing: quoted by your builder; VAT on our fee: none to add£Survey and regularisation drawings£1,035 inc survey£Council regularisation chargeset by the council£Opening up and testingquoted by your builder£VAT on our feenone to add
    The council's charge and any opening up are separate from our fee.

    How regularisation works

    Under regulation 18 the owner may apply in writing for a certificate for unauthorised work carried out on or after 11 November 1985, with a description of the work and plans where reasonably practicable. It is the owner's application, not the builder's.

    The council may require the work to be laid open, tested and sampled before it decides. That is the part that costs money and disrupts rooms, and it is the reason to get honest drawings first: they show where an inspector is likely to ask to look.

    A flat-fronted Victorian house of 1898 in brick and stone with arched sash windows and a bay
    A Victorian front elevation: an unsigned loft behind a facade like this is a typical case for regularisation.Photograph: sludgegulper, CC BY-SA 2.0

    Why not leave it

    Unapproved work remains an offence. Contravening the regulations can mean up to two years in prison, or a fine, on indictment. In practice the issue arrives at a sale, when a buyer's solicitor asks for the completion certificate and there is none.

    Designers and builders are also under a duty of competence for the work they do, which is a reason to have the work checked by someone who is.

    Planning is a separate question

    Building regulations and planning permission are separate regimes. If the same work also needed planning permission and never had it, the council can generally act against building work for ten years after completion, a period lengthened in April 2024.

    We tell you which of the two you face. Where planning is also missing, our retrospective planning service uses the same survey, so you do not pay for it twice.

    A hand drawing a floor plan with a black pen on tracing paper
    Plan drawn from a survey: regularisation starts from what is actually on the ground, not what the builder remembers.Photograph: homegets.com, CC BY 2.0

    What to send us

    Send the address, a note of what was done and when, and any paperwork you have from the builder. See our regularisation drawings page for the sheets we produce.

    Regularising work already builtTell us what was done and when; Fixed fee in writing; Measured survey of the work; Drawings and application prepared; Council decides, after any opening upi

    Tell us what was done and when

    ii

    Fixed fee in writing

    iii

    Measured survey of the work

    iv

    Drawings and application prepared

    v

    Council decides, after any opening up

    We say early what an inspector may want to see.

    The figures, with sources

    1. 11 Nov 1985

      Work carried out on or after this date without building regulations approval can be regularised.

      Source: Building Regulations 2010, regulation 18, checked 25 Oct 2026

    2. Owner applies

      The application is made in writing by the owner, with a description and plans where reasonably practicable.

      Source: Building Regulations 2010, regulation 18, checked 25 Oct 2026

    3. Opened up

      The council may require work to be laid open, tested and sampled before it decides.

      Source: Building Regulations 2010, regulation 18, checked 25 Oct 2026

    4. 2 years

      Longest prison term on indictment for contravening the building regulations, or a fine.

      Source: Building Act 1984, section 35, checked 17 Oct 2026

    5. 10 years

      Period in which planning enforcement can reach most unauthorised building work, since 25 April 2024.

      Source: Town and Country Planning Act 1990, section 171B, checked 17 Oct 2026

    6. Reg. 11F

      Designers and builders must have the skills, knowledge and experience for the work they carry out.

      Source: Building Regulations 2010, regulation 11F, checked 15 Oct 2026

    Questions

    Can I regularise work done before 1985?

    The regularisation route covers work from 11 November 1985. For older work, tell us the dates and we will explain your position.

    Will the council make me pull it down?

    That is for the council, and it depends on what the inspector finds. Honest drawings and an early approach are the sensible first step.

    Do you do the opening up?

    No. Your builder does it when the inspector asks; we tell you where and what they are likely to want to see.

    Is the council's charge in your fee?

    No. The council sets its own charge, and we confirm it with you before you apply.

    The fee for regularisation drawings

    Regularisation drawings

    from £1,035

    inc survey (£835 if you supply measured drawings). No VAT to add.

    Get a fixed quote from £1,035

    What you get

    • A measured survey of the finished work, included
    • Drawings recording the structure and finishes
    • The application written for you, as owner
    • Notes on where an inspector may ask to look
    • Free redraws if the council asks for changes
    House extension under construction with scaffolding, new glazed doors and building materials

    11 Nov 1985

    Work carried out on or after this date without building regulations approval can be regularised. Source: legislation.gov.uk

    Photograph: Brett Jordan
    Kensington street lined with brick townhouses and lit streetlamps beneath an orange dusk sky

    Send us the address of your house.

    We look up the conservation area, listing and Article 4 position, then reply with a fixed fee. A message before 3pm is answered the same working day.

    Regularisation Drawings Cost in London: From £1,035