A narrow period house on Heath Street in Hampstead with a bay window, pale green render and a small front step
Photograph: Images George Rex (CC BY-SA 2.0)

01Planning

How much does a Lawful Development Certificate cost in London?

A Lawful Development Certificate for a London house costs two things: our drawings, from £775 inc survey, or £200 less if you supply measured drawings, and the council's fee, which is half the normal planning fee, £274 for a householder scheme. Our fee is fixed with no VAT to add.

From £775 inc survey (£575 if you supply measured drawings)

  • MCIAT chartered architectural technologists
  • £2m professional indemnity insurance
  • LABC Partnered
  • ICO registered

Fixed fee, no VAT to add

Ask for a fixed fee

Photographs or current plans (optional)

Drag files here or browse your device

Up to 10 files, 90 MB in total: PDF, JPG, PNG or DWG

    Write to us before 3pm and we reply the same working day. Redraws are free until approval.

    What each bill covers

    The council's bill is the smaller one. For a certificate covering proposed work to a house, the fee is half the normal planning fee, which is £274 for a householder scheme. If the work is to a listed building, the same table shows no fee.

    Our bill is for the evidence an officer needs to say yes: a measured survey, existing and proposed plans and elevations, and a statement showing the scheme meets each limit of the permitted development class. From £775 inc survey, that is a fixed figure.

    A certificate for a householder schemeDrawings and statement: £775 inc survey; Council fee for the certificate: £274; Council fee, if planning were needed: £548; VAT on our fee: none to add£Drawings and statement£775 inc survey£Council fee for the certificate£274£Council fee, if planning were needed£548£VAT on our feenone to add
    The certificate fee is half the planning fee, as set out in the national table from 1 April 2026.

    What a certificate actually gives you

    Permitted development is your right under the Order; a certificate is the council confirming it in writing. Nothing forces you to apply. The owner who does is usually thinking ahead to a sale, when a buyer's solicitor may ask whether the extension, the loft or the outbuilding was lawfully built.

    The council has a legal target of eight weeks to decide a certificate application, so you know early whether the scheme stands.

    Front of a stucco house on Chester Square in Belgravia, with a pillared porch, black door, iron balconies and climbing plants
    Chester Square: where the front elevation is controlled, the certificate matters most for what is done at the back and on the roof.Photograph: Pierrette13, CC BY-SA 4.0

    Where permitted development stops

    Check the limits before you spend. Householder rights do not apply to flats or to buildings containing flats. A single-storey rear extension is limited to 3 or 4 metres in depth and four metres in height, a side extension to half the width of the original house, and eaves near the boundary to three metres.

    Conservation areas and other article 2(3) land lose the right to side extensions, cladding and rear extensions of more than one storey. The government's technical guidance is dated 2019 and the Order has been amended since, so we work from the Order, not the leaflet.

    How it compares with planning permission

    If a scheme sits inside the limits, a certificate costs less than an application and tests only whether the work is lawful, not whether the design is good. If it sits outside, we tell you in the free check and draw for planning permission instead.

    Some work needs neither. We say so when that is true, rather than sell you a document you do not need.

    A hand drawing a floor plan with a black pen on tracing paper
    A hand drawing a floor plan: the existing and proposed plans must agree before an officer can say the scheme is within the limits.Photograph: homegets.com, CC BY 2.0

    Getting started

    Send the address and the work you plan. See our page on permitted development and Lawful Development Certificates for the sheets we produce.

    From question to certificateFree check against the limits; Fixed fee in writing; Measured survey; Drawings and statement; Application to the councili

    Free check against the limits

    ii

    Fixed fee in writing

    iii

    Measured survey

    iv

    Drawings and statement

    v

    Application to the council

    If the scheme does not fit, you hear before paying.

    The figures, with sources

    1. £274

      Council charge for a certificate covering proposed householder work: half the planning fee.

      Source: Ribble Valley Borough Council, national fee table from 1 April 2026, checked 17 Oct 2026

    2. £0

      Council charge for a certificate for proposed works to a listed building.

      Source: Ribble Valley Borough Council, national fee table from 1 April 2026, checked 17 Oct 2026

    3. 8 weeks

      Period within which the council must decide a certificate application.

      Source: Development Management Procedure Order 2015, article 39, checked 15 Oct 2026

    4. 3 m / 4 m

      Depth limits for a single-storey rear extension as permitted development, attached and detached.

      Source: General Permitted Development Order 2015, Schedule 2, Part 1, Class A, checked 15 Oct 2026

    5. Half

      Widest a single-storey side extension may be, relative to the original house.

      Source: General Permitted Development Order 2015, Schedule 2, Part 1, Class A.1(j), checked 15 Oct 2026

    6. Art. 2(1)

      Flats and buildings containing flats are outside householder permitted development.

      Source: General Permitted Development Order 2015, article 2, checked 15 Oct 2026

    7. Sept 2019

      Date of the government's householder technical guidance, older than later changes to the Order.

      Source: MHCLG, Permitted development rights for householders: technical guidance, checked 15 Oct 2026

    Questions

    Is a Lawful Development Certificate the same as planning permission?

    No. Permission allows work the rules would otherwise stop. A certificate confirms that the work needs no permission because it falls inside the permitted development limits.

    Do I have to get one?

    No, but it is the paper a buyer's solicitor may ask for. Getting it before you build avoids arguing the point after.

    What if the council refuses the certificate?

    We tell you in the free check if the scheme looks outside the limits, so a refusal is unlikely. If one comes, we redraw free and can take you to planning permission.

    Does the survey have to be done by you?

    No. If you supply accurate measured drawings the price falls by the survey fee, and we check them on site first.

    The fee for permitted development drawings and lawful development certificate

    Permitted development drawings and Lawful Development Certificate

    from £775

    inc survey (£575 if you supply measured drawings). No VAT to add.

    Get a fixed quote from £775

    What you get

    • Our survey of the property, done on site and included
    • Existing and proposed plans and elevations
    • A statement showing the work meets each class limit
    • The application made to the council for you
    • Redraws at no charge if the officer asks
    Georgian brick terrace with sash windows, arched fanlight doorways, stone steps and iron railings in London

    £274

    Council charge for a certificate covering proposed householder work: half the planning fee. Source: ribblevalley.gov.uk

    Photograph: Lorenc Memaga
    Kensington street lined with brick townhouses and lit streetlamps beneath an orange dusk sky

    Send us the address of your house.

    We look up the conservation area, listing and Article 4 position, then reply with a fixed fee. A message before 3pm is answered the same working day.

    Lawful Development Certificate Cost in London: £775