How much does a feasibility study cost in London?

A feasibility and options study for a London house costs from £545 with us, as a fixed fee with no VAT to add. It tests the extensions you are considering against the planning rules for your address, so you can choose one before paying for full drawings.

From £545

  • MCIAT chartered architectural technologists
  • £2m professional indemnity insurance
  • LABC Partnered
  • ICO registered

Fixed fee, no VAT to add

Ask for a fixed fee

Photographs or current plans (optional)

Drag files here or browse your device

Up to 10 files, 90 MB in total: PDF, JPG, PNG or DWG

    Write to us before 3pm and we reply the same working day. Redraws are free until approval.

    What you pay for, and why it comes first

    Our fee is £545. For that we measure or take the existing plans of the house, look up the designations and rules that apply, and sketch the options you are weighing: a rear extension of one depth or another, a loft, a side return, or a combination. Each is set against the limits so you can see what it would involve.

    It sits before the drawings for a reason. A full planning set is built around one decision. A study lets you make that decision with the facts, so the drawings are drawn once.

    What the study containsThe house as it stands, to scale; Up to several options sketched; Each option tested against the rules; Which need an application, and which do not; A recommendation, in plain wordsiThe house as it stands, to scaleiiUp to several options sketchediiiEach option tested against the rulesivWhich need an application, and which do notvA recommendation, in plain words
    Choosing one option leads to full drawings from our other services.

    How much you can build without applying

    The rules do the first sorting. A single-storey rear extension may go 3 metres from an attached house and 4 from a detached one without an application, and extensions and outbuildings together may cover no more than half the garden. A terrace house can add 40 cubic metres of roof under the loft rules; other houses can add 50.

    Flats are different: householder permitted development does not apply to them at all, so a study for a flat starts from the position that anything external needs an application.

    A narrow period house on Heath Street in Hampstead with a bay window, pale green render and a small front garden
    A narrow Hampstead house: on a plot this tight the depth of an extension is limited by the neighbour as well as by the rules.Photograph: Images George Rex, CC BY-SA 2.0

    Rules that sit on top of the national ones

    Councils add their own tests. Merton, for example, applies a 45 degree line from the neighbour's nearest habitable room window to limit how far a rear projection may go. Your borough may use a different test, and the study reads yours.

    Where an option needs an application, the council's fee for a householder scheme is £548 from 1 April 2026, with a legal target of eight weeks to decide.

    What happens after you choose

    Once you have chosen, the study goes straight into the drawings: the survey, the plans and the elevations follow the same dimensions. If you have not decided, you can take the study to your builder or lender with the options priced against each other.

    Compare it with the pre-purchase planning report if you have not yet bought the house, and read about the service on our feasibility study page.

    A second-floor plan laid out on a drawing board with a parallel rule, pens and a scale
    A plan on the drawing board: each option starts as a sketch like this, before any is worked up in detail.Photograph: netan, CC BY 2.0

    Getting started

    Send the address and the ideas, however rough. We confirm the fee and what the study will show.

    From ideas to a decisionSend the address and your ideas; Fixed fee in writing; House recorded, rules checked; Options drawn and compared; You choose onei

    Send the address and your ideas

    ii

    Fixed fee in writing

    iii

    House recorded, rules checked

    iv

    Options drawn and compared

    v

    You choose one

    Nothing is submitted to the council at this stage.

    The figures, with sources

    1. 3 m / 4 m

      Reach of a single-storey rear extension without an application, on an attached house and a detached house.

      Source: General Permitted Development Order 2015, Schedule 2, Part 1, Class A, checked 15 Oct 2026

    2. Half

      Largest share of the garden that other buildings and extensions may cover under permitted development.

      Source: General Permitted Development Order 2015, Schedule 2, Part 1, Class A.1(b), checked 15 Oct 2026

    3. 40 m³

      Extra roof volume a terrace house may add under the loft rules; 50 cubic metres for other houses.

      Source: General Permitted Development Order 2015, Schedule 2, Part 1, Class B, checked 15 Oct 2026

    4. 45°

      Line some councils draw from the neighbour's nearest habitable window to limit a rear projection.

      Source: Merton Council, Small Sites Toolkit design guidance, checked 17 Oct 2026

    5. £548

      Charge by the council to decide a householder planning application from 1 April 2026.

      Source: Ribble Valley Borough Council, national fee table from 1 April 2026, checked 17 Oct 2026

    6. 8 weeks

      Statutory target for deciding a non-major planning application once valid.

      Source: Development Management Procedure Order 2015, article 34, checked 15 Oct 2026

    7. Art. 2(1)

      A flat, or a building containing flats, has no householder permitted development to test.

      Source: General Permitted Development Order 2015, article 2, checked 15 Oct 2026

    Questions

    Do I need a study if I already know what I want?

    Not always. It earns its fee where you are choosing between options, or where you are not sure if the one you want is allowed.

    Is the study credited against drawings?

    We tell you in writing, before you commit, how the study fits with any drawings that follow.

    Does it include a measured survey?

    The study works from the house as it stands. If you want survey-accurate drawings, those come with our drawings services.

    Will it tell me what the council will decide?

    No one can promise that. It tells you what the rules allow and where an officer is likely to look hardest.

    The fee for feasibility and options study

    Feasibility and options study

    from £545

    The total you pay. No VAT to add.

    Get a fixed quote from £545

    What you get

    • Your house recorded as it stands
    • Several options sketched and compared
    • Each tested against the rules for your address
    • Which options need an application and which do not
    • A recommendation to take to your builder or lender
    Rows of brick terraced houses and gardens on a residential street

    3 m / 4 m

    Reach of a single-storey rear extension without an application, on an attached house and a detached house. Source: legislation.gov.uk

    Photograph: Altaf Shah
    Kensington street lined with brick townhouses and lit streetlamps beneath an orange dusk sky

    Send us the address of your house.

    We look up the conservation area, listing and Article 4 position, then reply with a fixed fee. A message before 3pm is answered the same working day.

    Feasibility Study Cost in London: From £545